-Super-impose photos with the placement of speakers&mics
-Visuals layout of the online website
-Finalise the locations
-Mock up of the Max5 patch
-Edit the video documentations.
-List out possible equipment needed for the installation
-Detailed plan of the installation
-The specifics of the interaction
-Go through the presentation slides
-What can be done for the next 2 weeks
-do the max patches
-test out the patches in public
-Moar video documentation
-Test out rubbish bins all over school
-Document process on blog
Consideration
1. Wired or wireless?
2. Who is going to do what?
3. Custom make the dustbins or attach something to make use of ready made public dustbins?
4. If custom make, how realistic do we want it to be?
5. Is there some place in singapore where all the disused rubbished bins are disposed of?
6. Maybe we should go wireless
7. if wireless we would need 2 fm transmitters, 1 to send mic signal and 1 to send speaker signal.
8. How does the batteries work?
9. Online interaction
10. Additional audio interface?
11. whether if we change the frequencies higher or lower will affect the audience
12 how is the microphone gonna be placed?
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment